| Old Highway 80 (Arlington) | Gillespie Dam Bridge to Salome Highway | Arlington | Maricopa County | MCDOT | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 11.04 | No | $13,794,744 | Mid-Term |
| Old Highway 80 - Segment A | Gillespie Dam Bridge to Desert Rose Rd | Arlington | Maricopa County | MCDOT | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 4 | No | $4,995,265 | Mid-Term |
| Old Highway 80 - Segment B | Desert Rose Rd tp Cactus Rose Rd | Arlington | Maricopa County | MCDOT | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.99 | No | $2,485,795 | Mid-Term |
| Old Highway 80 - Segment C | Cactus Rose Road to Arlington School Rd | Arlington | Maricopa County | MCDOT | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 0.97 | No | $1,207,386 | Mid-Term |
| Old Highway 80 - Segment D | Arlington Arlington School Rd to 319th Ave | Arlington | Maricopa County | MCDOT | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 3.13 | No | $3,906,250 | Mid-Term |
| Old Highway 80 - Segment E | 319th Avenue to Salome Highway | Arlington | Maricopa County | MCDOT | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 0.96 | No | $1,200,047 | Mid-Term |
| Arlington Canal Road (Arlington) | Old Highway 80 to W. Dobbins Butte Game Rd | Arlington | Maricopa County | MCDOT | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 2.86 | Yes | $3,574,337 | Long-Term |
| Arlington Canal Road - Segment A | Old Highway 80 to 319th Ave | Arlington | Maricopa County | MCDOT | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 2.09 | No | $2,614,110 | Long-Term |
| Arlington Canal Road - Segment B | 319th Ave to Future South Bank Alignment | Arlington | Maricopa County | MCDOT | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 0.77 | Yes | $960,227 | Long-Term |
| 319TH Avenue (Arlington) | 319th Ave to Old Highway 80 | Arlington | Maricopa County | MCDOT | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.72 | No | $2,150,568 | Long-Term |
| 319TH Avenue | 319th Ave to Old Highway 80 | Arlington | Maricopa County | MCDOT | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.72 | No | $2,150,568 | Long-Term |
| Ultimate North Bank (Buckeye / Goodyear) | 319th Ave to Johnson Rd to Citrus Ln | Buckeye | City of Buckeye | Buckeye | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 20.51 | Yes | $25,640,388 | Long-Term |
| Ultimate North Bank (Buckeye) - Segment A | 319th Ave to Johnson Rd | Buckeye | City of Buckeye | Buckeye | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 2.32 | Yes | $2,893,939 | Long-Term |
| Ultimate North Bank (Buckeye) - Segment B | North Bank - Johnson Rd to Palo Verde Rd | Buckeye | City of Buckeye | Buckeye | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 2.05 | Yes | $2,563,684 | Long-Term |
| Ultimate North Bank (Buckeye) - Segment C | North Bank - Palo Verde Rd to Turner Rd | Buckeye | City of Buckeye | Buckeye | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 2.34 | Yes | $2,923,059 | Long-Term |
| Ultimate North Bank (Buckeye) - Segment D | North Bank - Turner Rd to Rooks Rd | Buckeye | City of Buckeye | Buckeye | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 2.17 | Yes | $2,707,623 | Long-Term |
| Ultimate North Bank (Buckeye) - Segment E | North Bank - Rooks Rd to Apache Rd | Buckeye | City of Buckeye | Buckeye | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 2.23 | Yes | $2,784,801 | Long-Term |
| Ultimate North Bank (Buckeye) - Segment F | North Bank - Apache Rd to Rainbow Rd | Buckeye | City of Buckeye | Buckeye | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 2.39 | Yes | $2,982,955 | Long-Term |
| Ultimate North Bank (Buckeye) - Segment G | North Bank - Rainbow Rd to Verrado Way | Buckeye | City of Buckeye | Buckeye | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 2.1 | Yes | $2,627,841 | Long-Term |
| Ultimate North Bank (Buckeye) - Segment H | North Bank - Verrado Way to Perryville Rd | Buckeye | City of Buckeye | Buckeye | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 2.93 | Yes | $3,661,695 | Long-Term |
| Ultimate North Bank (Buckeye) - Segment I | North Bank - Perryville Rd to Citrus Ln | Goodyear | City of Goodyear | Goodyear | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 2 | Yes | $2,494,792 | Long-Term |
| North Bank Connector (Goodyear) | Goodyear North Bank Connector - Estrella Parkway to Bullard Avenue | Goodyear | City of Goodyear | Goodyear | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 0.96 | Yes | $1,201,468 | Long-Term |
| North Bank Connector (Goodyear) | Goodyear North Bank Connector - Estrella Parkway to Bullard Avenue | Goodyear | City of Goodyear | Goodyear | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 0.96 | Yes | $1,201,468 | Long-Term |
| Buckeye Canal (BUCKEYE) | Buckeye Canal - Old Hwy 80 to Perryville Rd | Buckeye | City of Buckeye | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 18.12 | Yes | $22,649,858 | Mid-Term |
| Buckeye Canal (BUCKEYE) - Segment A | Buckeye Canal - Buckeye canal Rd to Johnson Rd | Buckeye | City of Buckeye | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 2.27 | Yes | $2,840,909 | Mid-Term |
| Buckeye Canal (BUCKEYE) - Segment B | Buckeye Canal - Johnson Rd to Bruner Rd | Buckeye | City of Buckeye | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1.48 | Yes | $1,846,591 | Mid-Term |
| Buckeye Canal (BUCKEYE) - Segment C | Buckeye Canal - Bruner Rd to Palo Verde Rd | Buckeye | City of Buckeye | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1.33 | Yes | $1,657,197 | Mid-Term |
| Buckeye Canal (BUCKEYE) - Segment D | Buckeye Canal - Palo Verde Rd to Wilson Ave | Buckeye | City of Buckeye | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1.04 | Yes | $1,302,083 | Mid-Term |
| Buckeye Canal (BUCKEYE) - Segment E | Buckeye Canal - Wilson Ave to Turner Rd | Buckeye | City of Buckeye | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1.02 | Yes | $1,278,409 | Mid-Term |
| Buckeye Canal (BUCKEYE) - Segment F | Buckeye Canal - Turner Rd to MC 85 | Buckeye | City of Buckeye | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1 | Yes | $1,254,735 | Mid-Term |
| Buckeye Canal (BUCKEYE) - Segment G | Buckeye Canal - MC 85 to Rooks Rd | Buckeye | City of Buckeye | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1.04 | Yes | $1,302,083 | Mid-Term |
| Buckeye Canal (BUCKEYE) - Segment H | Buckeye Canal - Rooks Rd to Miller Rd | Buckeye | City of Buckeye | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1.02 | Yes | $1,278,409 | Mid-Term |
| Buckeye Canal (BUCKEYE) - Segment I | Buckeye Canal - Miller Rd to Apache Rd | Buckeye | City of Buckeye | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1.06 | Yes | $1,325,758 | Mid-Term |
| Buckeye Canal (BUCKEYE) - Segment J | Buckeye Canal - Apache Rd to Watson Rd | Buckeye | City of Buckeye | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1 | Yes | $1,254,735 | Mid-Term |
| Buckeye Canal (BUCKEYE) - Segment K | Buckeye Canal - Watson Rd to Rainbow Rd | Buckeye | City of Buckeye | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1.08 | Yes | $1,349,432 | Mid-Term |
| Buckeye Canal (BUCKEYE) - Segment L | Buckeye Canal -Rainbow Rd to Dean Rd | Buckeye | City of Buckeye | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1.02 | Yes | $1,278,409 | Mid-Term |
| Buckeye Canal (BUCKEYE) - Segment M | Buckeye Canal - Dean Rd to Verrado Way | Buckeye | City of Buckeye | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1.04 | Yes | $1,302,083 | Mid-Term |
| Buckeye Canal (BUCKEYE) - Segment N | Buckeye Canal - Verrado Way to Jackrabbit Rd | Buckeye | City of Buckeye | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1.61 | Yes | $2,012,311 | Mid-Term |
| Buckeye Canal (BUCKEYE) - Segment O | Buckeye Canal - Jackrabbit Rd to Perryville Rd | Buckeye | City of Buckeye | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1.09 | Yes | $1,366,714 | Mid-Term |
| Buckeye Canal (Goodyear) - Section 1 | Buckeye Canal - Perryville Rd to Estrella Parkway | Goodyear | City of Goodyear | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 4.24 | Yes | $5,299,479 | Mid-Term |
| Buckeye Canal (Goodyear) - Segment P | Buckeye Canal - Perryville Rd to Citrus Rd | Goodyear | City of Goodyear | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 0.99 | Yes | $1,237,453 | Mid-Term |
| Buckeye Canal (Goodyear) - Segment Q | Buckeye Canal - Citrus Rd to Cotton Ln | Goodyear | City of Goodyear | BWDCD | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.08 | Yes | $1,349,432 | Mid-Term |
| Buckeye Canal (Goodyear) - Segment R | Buckeye Canal - Cotton Ln to Sarival Ave | Goodyear | City of Goodyear | BWDCD | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.08 | Yes | $1,349,432 | Mid-Term |
| Buckeye Canal (Goodyear) - Segment S | Buckeye Canal - Sarival Ave to Estrella Parkway | Goodyear | City of Goodyear | BWDCD | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.09 | Yes | $1,363,163 | Mid-Term |
| Buckeye Canal (Goodyear) - Section 2 | Buckeye Canal - Estrella Parkway to Litchfield Rd | Goodyear | City of Goodyear | BWDCD | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 2.57 | Yes | $3,217,330 | Mid-Term |
| Buckeye Canal (Goodyear) - Segment T | Buckeye Canal - Estrella Parkway to Bullard Ave | Goodyear | City of Goodyear | BWDCD | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.08 | Yes | $1,349,432 | Mid-Term |
| Buckeye Canal (Goodyear) - Segment U | Buckeye Canal - Bullard Ave to Litchfield Rd | Goodyear | City of Goodyear | BWDCD | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.49 | Yes | $1,867,898 | Mid-Term |
| Buckeye Canal (Avondale) | Buckeye Canal - Litchfield Rd to El Mirage Rd | Avondale | City of Avondale | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 2.24 | Yes | $2,795,928 | Mid-Term |
| Buckeye Canal (Avondale ) - Segment V | Buckeye Canal - Litchfield Rd to Vermeersch Rd | Avondale | City of Avondale | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1.18 | Yes | $1,470,170 | Mid-Term |
| Buckeye Canal (Avondale ) - Segment W | Buckeye Canal - Vermeersch Rd to El Mirage Rd | Avondale | City of Avondale | BWDCD | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1.06 | Yes | $1,325,758 | Mid-Term |
| North Bank (Avondale) | North Bank - Agua Fria River to El Mirage Rd | Avondale | City of Avondale | Avondale | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1.93 | Yes | $2,412,169 | Long-Term |
| North Bank (Avondale) | North Bank - Agua Fria River to El Mirage Rd | Avondale | City of Avondale | Avondale | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 1.93 | Yes | $2,412,169 | Mid-Term |
| El Mirage Road (Avondale) | El Mirage Rd - Buckeye Canal to Gila River North Bank | Avondale | City of Avondale | BWDCD / Avondale | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 0.74 | No | $923,295 | Long-Term |
| El Mirage Road - Buckeye Canal to Gila River North Bank | El Mirage Rd - Buckeye Canal to Gila River North Bank | Avondale | City of Avondale | BWDCD / Avondale | Levee Pathway | Alternate North Bank | 16 FT Wide | Asphalt / Concrete | 0.74 | No | $923,295 | Long-Term |
| North Bank (Avondale) | North Bank - El Mirage Rd to 107th Ave | Avondale | City of Avondale | Avondale | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 2.05 | Yes | $2,557,528 | Long-Term |
| North Bank - El Mirage Rd to 107th Ave (Avondale) - Segment A | North Bank - El Mirage Rd to 107th Ave | Avondale | City of Avondale | Avondale | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 2.05 | Yes | $2,557,528 | Long-Term |
| North Bank (Phoenix) - Section 1 | North Bank - 107th Ave to 7th Ave (Phoenix) | Phoenix | City of Phoenix | Phoenix | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 13.73 | Yes | $17,159,564 | Long-Term |
| North Bank (Phoenix) - Segment B | North Bank - 107th Ave to 99th Ave | Phoenix | City of Phoenix | Phoenix | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.04 | No | $1,301,373 | Long-Term |
| North Bank (Phoenix) - Segment C | North Bank - 99th Ave to 91st Ave | Phoenix | City of Phoenix | Phoenix | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.16 | No | $1,444,129 | Long-Term |
| North Bank (Phoenix) - Segment D | North Bank - 91st Ave to 83rd Ave | Phoenix | City of Phoenix | Phoenix | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.31 | | $1,633,523 | Long-Term |
| North Bank (Phoenix) - Segment E | North Bank - 83rd Ave to 75th Ave | Phoenix | City of Phoenix | Phoenix | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.12 | Yes | $1,396,780 | Long-Term |
| North Bank (Phoenix) - Segment F | North Bank - 75th Ave to 67th Ave | Phoenix | City of Phoenix | Phoenix | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.14 | | $1,420,455 | Long-Term |
| North Bank (Phoenix) - Segment G | North Bank - 67th Ave to 59th Ave | Phoenix | City of Phoenix | Phoenix | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.23 | Yes | $1,538,826 | Long-Term |
| North Bank (Phoenix) - Segment H | North Bank - 59th Ave to 51st Ave | Phoenix | City of Phoenix | Phoenix | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.04 | No | $1,302,083 | Long-Term |
| North Bank (Phoenix) - Segment I | North Bank - 51st Ave to 43rd Ave | Phoenix | City of Phoenix | Phoenix | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.36 | | $1,704,545 | Long-Term |
| North Bank (Phoenix) - Segment J | North Bank - 43rd Ave to 35th Ave | Phoenix | City of Phoenix | Phoenix | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.02 | | $1,278,409 | Long-Term |
| North Bank (Phoenix) - Segment K | North Bank - 35th Aven to 27th Ave | Phoenix | City of Phoenix | Phoenix | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.1 | | $1,373,106 | Long-Term |
| North Bank (Phoenix) - Segment L | North Bank - 27th Ave to 19th Ave | Phoenix | City of Phoenix | Phoenix | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1 | | $1,254,735 | Mid-Term |
| North Bank (Phoenix) - Segment M | North Bank - 19th Ave to 7th Ave | Phoenix | City of Phoenix | Phoenix | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.21 | | $1,511,600 | Short-Term |
| North Bank (Phoenix) - Section 2 | North Bank (Phoenix) - 16th Street | Phoenix | City of Phoenix | Phoenix | Multi-Use Pathway | North Bank | 12 FT Wide | Concrete | 0.16 | | $206,203 | Short-Term |
| North Bank (Phoenix) - 16th Street | North Bank (Phoenix) - 16th Street | Phoenix | City of Phoenix | Phoenix | Multi-Use Pathway | North Bank | 12 FT Wide | Concrete | 0.16 | No | $206,203 | Short-Term |
| North Bank (Phoenix) - Section 3 | North Bank (Phoenix) - 24th Street | Phoenix | City of Phoenix | Phoenix | Multi-Use Pathway | North Bank | 12 FT Wide | Concrete | 0.57 | | $713,068 | Short-Term |
| North Bank (Phoenix) - 24th Street | North Bank (Phoenix) - 24th Street | Phoenix | City of Phoenix | Phoenix | Multi-Use Pathway | North Bank | 12 FT Wide | Concrete | 0.57 | | $713,068 | Short-Term |
| North Bank (Phoenix) - Section 4 | North Bank (Phoenix) - 24th St to 48th St | Phoenix | City of Phoenix | Phoenix | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 3.17 | | $3,957,623 | Short-Term |
| North Bank (Phoenix) - Segment N | North Bank (Phoenix) - 24th St to 32nd St | Phoenix | City of Phoenix | Phoenix | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 0.93 | | $1,160,038 | Short-Term |
| North Bank (Phoenix) - Segment O | North Bank (Phoenix) - 32nd St to 40th St | Phoenix | City of Phoenix | Phoenix | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.06 | | $1,325,758 | Short-Term |
| North Bank (Phoenix) - Segment P | North Bank (Phoenix) - 40th St to 48th St | Phoenix | City of Phoenix | Phoenix | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.16 | | $1,448,153 | Short-Term |
| North Bank (Tempe) - Section 5 | North Bank (Tempe) - 48th St to Priest Dr | Tempe | City of Tempe | Tempe | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.18 | | $1,475,616 | Short-Term |
| North Bank (Tempe) - Segment Q | North Bank (Tempe) - 48th St to Priest Dr | Tempe | City of Tempe | Tempe | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 1.18 | No | $1,475,616 | Short-Term |
| North Bank (Tempe) - Section 6 | North Bank (Tempe) - Miller Rd to McClintock Dr | Tempe | City of Tempe | Tempe | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 0.61 | Yes | $760,653 | Long-Term |
| North Bank (Tempe) - Segment R | North Bank (Tempe) - Miller Rd to McClintock Dr | Tempe | City of Tempe | Tempe | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 0.61 | Yes | $760,653 | Long-Term |
| North Bank (SRPMIC) - Section 7 | North Bank (SRPMIC) - McClintock Dr to Alma School Rd | SRPMIC | SRPMIC | SRPMIC | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 3.64 | Yes | $4,547,822 | Long-Term |
| North Bank (SRPMIC) - Segment 7 | North Bank (Mesa) - McClintock Dr to Alma School Rd | SRPMIC | SRPMIC | SRPMIC | Levee Pathway | North Bank | 16 FT Wide | Asphalt / Concrete | 3.64 | Yes | $4,547,822 | Long-Term |
| South Bank (Arlington) - Section 1 | South Bank (Arlington) - Gillespie Dam to 319th Ave | Arlington | Maricopa County | MCDOT | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 6.84 | Yes | $8,552,557 | Long-Term |
| South Bank (Arlington) - Segment A | South Bank (Arlington) - Gillespie Dam to Desert Rose Rd | Arlington | Maricopa County | MCDOT | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 3.64 | | $4,545,928 | Long-Term |
| South Bank (Arlington) - Segment B | South Bank (Arlington) - Desert Rose Rd to 319 Ave | Arlington | Maricopa County | MCDOT | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 3.21 | | $4,007,102 | Long-Term |
| South Bank (Buckeye) - Section 2 | South Bank (Buckeye) - 319th Ave to Perryville Rd | Buckeye | City of Buckeye | Buckeye | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 18.81 | | $23,511,127 | Long-Term |
| South Bank (Buckeye) - Segment C | South Bank (Buckeye) - 319th Ave to Johnson Rd | Buckeye | City of Buckeye | Buckeye | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.08 | | $2,597,538 | Long-Term |
| South Bank (Buckeye) - Segment D | South Bank (Buckeye) - Johnson Rd to Palo Verde Rd | Buckeye | City of Buckeye | Buckeye | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.31 | | $2,888,258 | Long-Term |
| South Bank (Buckeye) - Segment E | South Bank (Buckeye) - Palo Verde Rd to Turner Rd | Buckeye | City of Buckeye | Buckeye | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.23 | | $2,793,561 | Long-Term |
| South Bank (Buckeye) - Segment F | South Bank (Buckeye) - Turner Rd to Rooks Rd | Buckeye | City of Buckeye | Buckeye | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.22 | | $2,769,886 | Long-Term |
| South Bank (Buckeye) - Segment G | South Bank (Buckeye) - Rooks Rd to Apache Rd | Buckeye | City of Buckeye | Buckeye | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.27 | | $2,840,909 | Long-Term |
| South Bank (Buckeye) - Segment H | South Bank (Buckeye) - Apache Rd to Rainbow Rd | Buckeye | City of Buckeye | Buckeye | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.35 | | $2,935,606 | Long-Term |
| South Bank (Buckeye) - Segment I | South Bank (Buckeye) - Rainbow Rd to Verrado Way | Buckeye | City of Buckeye | Buckeye | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.35 | | $2,935,606 | Long-Term |
| South Bank (Buckeye) - Segment J | South Bank (Buckeye) - Verrado Way to Perryville Rd | Buckeye | City of Buckeye | Buckeye | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 3 | | $3,749,053 | Long-Term |
| South Bank (Goodyear) - Segment K | South Bank (Goodyear) - Perryville Rd to Citrus Ln | Goodyear | City of Goodyear | Goodyear | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 1.19 | | $1,482,955 | Long-Term |
| South Bank (Goodyear) - Segment L | South Bank (Goodyear) - Citrus Ln to Sarival Rd | Goodyear | City of Goodyear | Goodyear | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.5 | | $3,125,000 | Long-Term |
| South Bank (Goodyear) - Segment M | South Bank (Goodyear) - Sarival Rd to Bullard Ave | Goodyear | City of Goodyear | Goodyear | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.23 | | $2,793,324 | Long-Term |
| South Bank (Goodyear / Avondale) - Section 3 | South Bank (Goodyear) - Bullard Ave to Avondale Rd | Goodyear / Avondale | City of Goodyear / City of Avondale | Goodyear / Avondale | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 4.75 | Yes | $5,939,867 | Long-Term |
| South Bank (Goodyear) - Segment N | South Bank (Goodyear) - Bullard Ave to Litchfield Rd | Goodyear | City of Goodyear | Goodyear | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 1.18 | | $1,480,824 | Long-Term |
| South Bank (Avondale) - Segment O | South Bank (Avondale) - Litchfield Rd to El Mirage Rd | Avondale | City of Avondale | Avondale | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.49 | | $3,111,979 | Long-Term |
| South Bank (Avondale) - Segment P | South Bank (Avondale) - El Mirage Rd to Avondale Rd | Avondale | City of Avondale | Avondale | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 1.08 | | $1,347,064 | Long-Term |
| South Bank (Avondale / Phoenix) - Section 4 | South Bank (Avondale / Phoenix) - Avondale Rd to 15th Ave | Avondale / Phoenix | City of Avondale / City of Phoenix | Avondale / Phoenix | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 14.46 | Yes | $18,080,019 | Long-Term |
| South Bank (Avondale) - Segment Q | South Bank (Avondale) - Avondale Rd to 107th Ave | Avondale | City of Avondale | Avondale | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 1.01 | | $1,263,731 | Long-Term |
| South Bank (Phoenix) - Segment R | South Bank (Phoenix) 107th Ave to 99th Ave | Phoenix | City of Phoenix | Phoenix | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 1.14 | | $1,421,402 | Long-Term |
| South Bank (Phoenix) - Segment S | South Bank (Phoenix) 99th Ave to 83rd Ave | Phoenix | City of Phoenix | Phoenix | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.15 | | $2,688,920 | Long-Term |
| South Bank (Phoenix) - Segment T | South Bank (Phoenix) 83rd Ave to 67th Ave | Phoenix | City of Phoenix | Phoenix | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.22 | | $2,777,462 | Long-Term |
| South Bank (Phoenix) - Segment U | South Bank (Phoenix) 67th Ave to 51st Ave | Phoenix | City of Phoenix | Phoenix | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.68 | | $3,354,167 | Long-Term |
| South Bank (Phoenix) - Segment V | South Bank (Phoenix) 51st Ave to 35th Ave | Phoenix | City of Phoenix | Phoenix | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.2 | | $2,746,212 | Long-Term |
| South Bank (Phoenix) - Segment W | South Bank (Phoenix) 35th Ave to 15th Ave | Phoenix | City of Phoenix | Phoenix | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 3.06 | | $3,828,125 | Long-Term |
| South Bank - (Mesa) - South Canal - Section 5 | South Bank (Mesa) - South Canal - Alma School Rd to Center St | Mesa | City of Mesa | SRP | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 1.71 | Yes | $2,133,759 | Short-Term |
| South Bank (Mesa) - South Canal - Segment A | South Bank (Mesa) - South Canal - Alma School Rd to Center St | Mesa | City of Mesa | SRP | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 1.71 | Yes | $2,133,759 | Short-Term |
| South Bank - (Mesa) - South Canal - Section 6 | South Bank (Mesa) - South Canal - Mesa Dr to Power Rd | Mesa | City of Mesa | SRP | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 9.65 | Yes | $12,067,235 | Mid-Term |
| South Bank (Mesa) - South Canal - Segment B | South Bank (Mesa) - South Canal - Mesa Dr to Gilbert Rd | Mesa | City of Mesa | SRP | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.61 | Yes | $3,267,045 | Mid-Term |
| South Bank (Mesa) - South Canal - Segment C | South Bank (Mesa) - South Canal - Gilbert Rd to Val Vista Dr | Mesa | City of Mesa | SRP | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.14 | Yes | $2,675,189 | Mid-Term |
| South Bank (Mesa) - South Canal - Segment D | South Bank (Mesa) - South Canal - Val Vista Dr to Higley Rd | Mesa | City of Mesa | SRP | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.91 | Yes | $3,635,890 | Mid-Term |
| South Bank (Mesa) - South Canal - Segment E | South Bank (Mesa) - South Canal - Higley Rd to Power Rd | Mesa | City of Mesa | SRP | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 3.37 | Yes | $4,217,330 | Mid-Term |
| South Bank - (Mesa) - Tonto National Forest - Section 7 | South Bank (Mesa) - South Canal to Phon D Sutton Recreation Area | Mesa | City of Mesa | USDA | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 3.74 | Yes | $4,675,663 | Long-Term |
| South Bank (Mesa) - Tonto National Forest - Segment A | South Bank (Mesa) - South Canal to Granite Reef Recreation Area | Mesa | City of Mesa | SRP | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 0.79 | Yes | $992,188 | Long-Term |
| South Bank (Mesa) - Tonto National Forest - Segment B | South Bank (Mesa) - Granite Reef Trailhead to Phon D Sutton Recreation Area | Mesa | City of Mesa | USDA | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.82 | Yes | $3,523,201 | Long-Term |
| South Bank - (Mesa) - Tonto National Forest - Section 8 | South Bank (Mesa) - Phon D Sutton Recreation Area to Coon Bluff Recreation Area | Mesa | City of Mesa | USDA | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 1.24 | Yes | $1,550,189 | Long-Term |
| South Bank (Mesa) - Tonto National Forest - Segment C | South Bank (Mesa) - Phon D Sutton Recreation Area to Coon Bluff Recreation Area | Mesa | City of Mesa | USDA | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 1.24 | Yes | $1,550,189 | Long-Term |
| South Bank - (Mesa) - Tonto National Forest - Section 9 | South Bank (Mesa) - Coon Bluff Recreation Area to Water Users Recreation Site | Mesa | City of Mesa | USDA | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 8.18 | Yes | $10,218,987 | Long-Term |
| South Bank (Mesa) - Tonto National Forest - Segment D | South Bank (Mesa) - Coon Bluff Recreation Area to GoldField Recreation Area | Mesa | City of Mesa | USDA | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.1 | Yes | $2,628,788 | Long-Term |
| South Bank (Mesa) - Tonto National Forest - Segment E | South Bank (Mesa) - GoldField Recreation Area to Unnamed Trailhead | Mesa | City of Mesa | USDA | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 2.05 | Yes | $2,568,655 | Long-Term |
| South Bank (Mesa) - Tonto National Forest - Segment F | South Bank (Mesa) - Unnamed Trailhead to Sheep's Crossing Recreation Site | Mesa | City of Mesa | USDA | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 1.77 | Yes | $2,212,595 | Long-Term |
| South Bank (Mesa) - Tonto National Forest - Segment G | South Bank (Mesa) - Sheep's Crossing Recreation Site to Pebble Beach Recreation Area | Mesa | City of Mesa | USDA | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 0.93 | Yes | $1,160,038 | Long-Term |
| South Bank (Mesa) - Tonto National Forest - Segment H | South Bank (Mesa) - Pebble Beach Recreation Area to Water Users Recreation Site | Mesa | City of Mesa | USDA | Multi-Use Pathway | South Bank | 12 FT Wide | Concrete | 1.32 | Yes | $1,648,911 | Long-Term |